Silicon Valley’s Anderson Dam, a 240-foot relic from 1950, is getting a $3.2 billion seismic upgrade to survive a major earthquake—raising its wall by 7 feet, replacing critical pipelines, and rebuilding for flood control. Construction starts in 2027, wrapping by 2033, after a new tunnel replaces an old outlet pipe. Built to withstand today’s quake risks, the dam’s failure could unleash catastrophic flooding across Silicon Valley to Monterey Bay. Drained in 2020 as a precaution, this 10-year project is vital for water security and public safety.

Listen in comfort:
Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn.

Advertise on DNN:
advertise@thednn.ai

This is an automated, high-level news summary based on public reporting.
Report issues to feedback@thednn.ai.

View sources & latest updates:
https://sources.thednn.ai/ab44a7c1aab3135a

Podden och tillhörande omslagsbild på den här sidan tillhör The Daily News Now!. Innehållet i podden är skapat av The Daily News Now! och inte av, eller tillsammans med, Poddtoppen.