DOF Talks
Avsnitt

Episode 3 - Live from Skandi Skansen

Dela

We take you on board Skandi Skansen, one of the two vessels at Gulen assembly site, where the wind turbines headed for the Hywind Tampen floating wind farm will be assembled. We hear from Roger Storebø, the captain of Skandi Skansen, and the marine operations manager Rune Nilsen, as well as the shift supervisor Gary Bruce, who give us an insight into the work that goes into this huge task. Marianne is then joined by Camilla and Narve in studio, to talk about the safety aspect, which is our highest priority when working on these projects.

Hosted on Acast. See acast.com/privacy for more information.

Podden och tillhörande omslagsbild på den här sidan tillhör DOF. Innehållet i podden är skapat av DOF och inte av, eller tillsammans med, Poddtoppen.